Description
UZIN KE 2000 S is a strong, solvent-free adhesive for LVT, vinyl, carpet, lino and rubber, on floors and walls. It grabs quickly but gives you a long working time, and can be laid wet, pressure-sensitive, as a contact adhesive or with the double drop method. It’s odourless during and after laying. Available in 6kg and 14kg tubs.
- For LVT, vinyl, carpet, lino (sheets up to 3.2mm) and rubber (sheets up to 4mm)
- Floors and walls
- Open time 10 to 45 minutes, working time up to 2 hours
- Suitable over warm water underfloor heating
- Odourless, solvent-free, very low emission (EMICODE EC1 PLUS)
Where can I use it?
- LVT & vinylSuitableA2 notch
- Carpet & linoSuitableB1 notch
- WallsSuitableRoll on, then trowel
- Underfloor heatingSuitableWarm water systems
Questions
How much do I need?With an A2 notch for LVT, vinyl and rubber, it takes 250 to 320g per m²: about 44 to 56m² per 14kg, or 19 to 24m² per 6kg. With a B1 notch for carpet and lino, it takes 320 to 380g per m²: about 37 to 44m² per 14kg, or 16 to 19m² per 6kg.
How long do I have to lay the floor?With A2 for LVT, vinyl and rubber, leave it 10 to 20 minutes, then lay within 10 to 20 minutes. With B1 for carpet and lino, leave it 15 to 25 minutes, then lay within 10 to 30 minutes. Times are at 20°C.
When can I put the furniture back?After about 24 hours. Seams can be sealed after 24 hours, and the adhesive reaches full strength after about 3 days.
Can I use it on walls?Yes. Roll it onto the wall with a nylon roller, comb it through with a notched trowel straight away and let it tack up, then put the covering on and rub it down.
Can I use it as a carpet tile tackifier?Yes, when it’s rolled on rather than trowelled.
Is it OK in a room with lots of sun?It isn’t made for heat from strong sunlight. For sunny rooms, use UZIN KE 66 HT or UZIN KE 49 HT laid wet, which cope with higher temperatures.
Do I need to prime and level first?Yes. The floor needs to be sound, dry and clean, then primed and smoothed. Use UZIN primers and smoothing compounds, such as UZIN PE 260 and UZIN NC 196, and let them dry completely.
Can it go over old adhesive?Old adhesive is best removed. If it can’t be, use a barrier primer and smooth the floor with about 3mm of compound first.
Is it OK with office chairs?Yes, chairs on castors are fine, as long as there’s at least 1mm of smoothing compound under the flooring.
Can I use it in the cold?The floor needs to be at least 15°C when you lay it. It works best at 18 to 25°C.
Specifications
Pack sizes: 6kg or 14kg tub
Coverage: A2: about 44–56m² per 14kg, 19–24m² per 6kg. B1: about 37–44m² per 14kg, 16–19m² per 6kg
Trowel notch: A2 (LVT, vinyl, rubber) or B1 (carpet, lino)
Open time: 10–45 minutes
Working time: 15–120 minutes
Seam sealing: After 24 hours
Final strength: After about 3 days
Minimum floor temperature: 15°C
Colour: Cream white, dries clear
Suitable for: LVT; vinyl, PVC and CV; carpet and textile coverings; linoleum sheets up to 3.2mm; rubber sheets up to 4mm
Bonding methods: Wet set, pressure sensitive, contact and double drop
Use: Interior, floors and walls
Technical data sheet: Open PDF
Applications
- Prepare. The floor must be sound, dry and clean. Prime and smooth it, and let both dry completely. Let the flooring settle to room temperature first.
- Spread. Apply an even coat with an A2 notched trowel for LVT, vinyl and rubber, or B1 for carpet and lino.
- Wait. 10 to 20 minutes with A2, or 15 to 25 minutes with B1. Only spread as much as you can cover within the working time.
- Lay. Press the flooring into the adhesive and rub or roll it in, pushing out any trapped air.
- Roll again. After about 20 minutes, roll or rub the edges and seams again.
- Clean up. Remove fresh adhesive with water.
Please note: times are at 20°C for laying into wet adhesive. For pressure-sensitive, contact or double drop methods, see the data sheet or call us on 01482 243038.
Compare adhesives
Compare all 7 adhesives
You’re viewingUZIN KE 2000 SUp to 56m²FlooringLVT, vinyl, carpet, lino
Per tub14kg, A2 notch
Working timeUp to 120 min
Also with an A2 spreaderLVT, vinyl, carpet and lino
LVT high tempUZIN KE 66 HTUp to 64m²FlooringLVT, vinyl, rubber
Per tub14kg, A2 notch
Working timeUp to 20 min
View adhesive LVT high temp + PSUZIN KE 49 HT47–70m²FlooringLVT, vinyl
Per tub14kg, A1–A2 notch
Working timeUp to 120 min
View adhesive Vinyl & carpetUZIN KE 2428Up to 39m²FlooringVinyl, carpet, lino
Per tub14kg, B1 notch
Working timeUp to 45 min
View adhesive CarpetUZIN UZ 54Up to 47m²FlooringCarpet
Per tub14kg, B1 notch
Working timeUp to 25 min
View adhesive Carpet tilesUZIN U 2100Up to 200m²FlooringCarpet tiles
Per tub10kg, foam roller
Working timeUp to 48 hrs
View adhesive Wood flooringPALLMANN P4Up to 16m²FlooringEngineered wood
Per tub16kg
Working timeUp to 30 min
View adhesive Coverage: the most one tub covers at the notch shown. Bigger notches use more adhesive, so cover less.
Working time: how long you have to lay the floor once the adhesive is spread.
Figures are from the manufacturer data sheets, at about 20°C. Warm rooms shorten the times, cold rooms lengthen them.