Description
Kelmore PrimeMore MVS is a ready-to-use moisture vapour suppressant for screeds and concrete that still hold construction moisture. Two coats let you level and lay the floor sooner, on floors up to 95% RH (85% RH on heated screeds). It also primes the floor, so a Kelmore levelling compound goes straight on top.
- For construction moisture up to 95% RH
- Heated screeds up to 85% RH
- Two coats, the second at right angles to the first
- Up to 40m² per 10kg (two coats)
- Touch dry in about 20 minutes (first coat) and 30 minutes (second coat) at 20°C
- Tinted purple, so you can see full coverage
Please note: only use it where the floor has an effective structural damp proof membrane.
Where can I use it?
- Cement screedsSuitableUp to 95% RH
- Heated screedsSuitableUp to 85% RH
- ConcreteSuitableIncluding power floated, once prepared
- No DPM in the floorNot suitableUse Kelmore One Coat DPM Fast
Questions
How many coats do I need?Two. Roll the first coat in one direction, then once it’s touch dry, roll the second at right angles to it. If you can see pinholes or thin patches once it’s dry, add another coat.
How far does 10kg go?Up to 40m² for two coats on a smooth floor. Rough or porous floors take more.
When can I level over it?Once the second coat is dry, about 30 minutes at 20°C. Lay a Kelmore levelling compound at least 3mm thick within 24 hours. If you go past 24 hours, apply another coat first.
Do I need a primer as well?No. Two coats of MVS prime the floor, so the levelling compound goes straight on.
Which screeds can go on top?Kelmore levelling compounds, such as Absolute 30, LevelMore Pro and Flex & Fibre.
What if the floor is rough?Smooth it first with Absolute 30, LevelMore Pro or Flex & Fibre. They’re moisture tolerant, so they can go down before the MVS.
Can I use it over underfloor heating?Yes, on heated screeds up to 85% RH. Switch the heating off 48 hours before you start.
Is it a damp proof membrane?No. It’s for moisture left in a new screed or concrete slab that’s still drying out. The floor still needs a structural DPM underneath. For a damp floor with no DPM, use Kelmore One Coat DPM Fast.
Can I use it in the cold?The air and the floor both need to be 10°C or above.


